Oregon State Capitol Textiles

W10 1 21 FAW B REPAIR1 31

Final step before tying was to release the tension caused by the repair, and to space the warp and weft yarns into the proper spacing. “B” was rehemmed.

Bookmark the permalink.

Leave a Reply